YC-GSW-1 steel wire horizontal displacement transducers is suitable for monitoring of internal displacement of earth-rock dams, earth embankments, slopes, etc. It is an efficient and reliable monitoring equipment for inspection of stability of the tested buildings. It complies with the technical specifications for earth-rock dam safety monitoring (SL60-94).
YC-GSW-1 steel wire horizontal displacement transducers can be installed separately or in combination with a water pipe settlement instrument.
Main Specification:
Measurement point: 1 - 6 points as requested
Wire Length: 10~200 m
Measurement range: 500~800 mm
Minimum readout: 0.02 mm
Measure accurancy: ±2.0mm/100m
Steel Wire Diameter: Φ 2 mm
Packaging & Delivery
1.Packaging Details: |
1. Wooden box
2. Carton
3. As your request. |
2.Delivery Detail: |
Shipped in 30 days after payment |
3.Logo: |
Any logo is available |
4.MOQ: |
100 pcs |
5.Samples: |
Free |
6.OEM Accepted |
Yes |
7.Production Capacity: |
10,000pcs Per week |
8.Payment Term: |
(1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM |
FAQ:
Q1.Can I get free samples?
A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q3. Are you a trading company or a manufacturer?
A: We are a manufacturer.
Q4. What is your payment term?
A:Normally T/T 50% in advance, balance to be paid before delivery.
Q5: What is your main market?
A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.
Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.
Q7. What about the lead time?
A:Sample needs 15 days, mass production time needs 35 days.